Certified information security, but hardly any information on its own use of AI
Overall rating “limited”. No deduction for controversies. The superscript numbers link directly to the source.
1 · Responsibility
MPS has assigned technology risks to a board committee, but for its internal use of AI there are only references to unpublished policies.
What is documented
- The independent NCG committee oversees cybersecurity, data protection, IT security and ESG1 2
- The proxy statement describes several directors with experience in AI risks1
- At management level there is an ESG Steering Committee and a Cybersecurity Steering Committee2 3
- An external, multilingual hotline allows anonymous reports, which go to the Audit Committee chair and the Chief Compliance Officer3 8
The case against
No AI governance documented
- The risk factors mention restrictions on external AI tools such as ChatGPT as well as policies and training on AI use, without disclosing them4 5
- For its own AI agents in HR and customer service, which according to job postings are based on fine-tuned open models, no approval procedure is described6 7
- The code of conduct and the supplier code do not mention AI8 11
Sources for Responsibility (11)
- U.S. SEC (EDGAR): Monolithic Power Systems – Proxy Statement DEF 14A 2026 · 30 April 2026 · primary source
- U.S. SEC (EDGAR, XBRL R13): 10-K 2025 – Cybersecurity Risk Management and Strategy Disclosure (R13.htm) · 27 February 2026 · primary source
- Monolithic Power Systems: Corporate Responsibility Report 2026 (reporting year 2025) · 1 April 2026 · primary source
- U.S. SEC (EDGAR): Monolithic Power Systems – Form ARS (annual report) 2025 · 29 April 2026 · secondary source
- Monolithic Power Systems (Investor Relations): MPS 2025 Form 10-K (PDF) · 27 February 2026 · secondary source
- Simplify (Stelleninserat Monolithic Power Systems): AI Developer Intern (Summer 2026) (job posting) · 16 May 2026 · secondary source
- glich.co Jobboard (Stelleninserat Monolithic Power Systems): AI Platform Engineer Intern (job posting) · 16 September 2025 · secondary source
- Monolithic Power Systems: Code of Ethics and Business Conduct, Rev. 2.1 · 16 January 2024 · secondary source
- Monolithic Power Systems: 2026 MPS GRI Report (Index) · 1 May 2026 · secondary source
- Monolithic Power Systems: MPS ESG Report 2025 (reporting year 2024) · 1 April 2025 · secondary source
- Monolithic Power Systems: Supplier Code of Conduct · 26 October 2022 · secondary source
2 · Safety
MPS documents information security and product quality with certificates from BSI, ENX and TÜV SÜD, but some apply only to Chengdu, and AI-specific testing is missing.
What is documented
- BSI has certified the Chengdu site under ISO/IEC 27001 since 2021, currently under the 2022 version until December 20277 8
- ENX confirms a TISAX label for Chengdu until April 20289
- A Cybersecurity Steering Committee, penetration tests, third-party assessments and quarterly reports to the NCG committee; according to the filing no material incidents10 11
- TÜV SÜD certifies San Jose and Chengdu under ISO 9001:2015; in addition there are ISO 26262 processes and full electrical final testing1 2
- MPS has declared a sales stop to Russia and Belarus since February 2022 and binds its distributors to it13
The case against
Sources for Safety (17)
- TÜV SÜD America Inc.: Certificate 951 12 6206 – ISO 9001:2015 multi-site · 15 July 2025 · primary source
- Monolithic Power Systems: Corporate Responsibility Report 2026 (reporting year 2025) · 1 April 2026 · primary source
- Monolithic Power Systems: MPS ESG Report 2025 (reporting year 2024) · 1 April 2025 · secondary source
- Monolithic Power Systems: Quality Policy & Certificates · 3 November 2026 · secondary source
- Simplify (Stelleninserat Monolithic Power Systems): AI Developer Intern (Summer 2026) (job posting) · 16 May 2026 · secondary source
- glich.co Jobboard (Stelleninserat Monolithic Power Systems): AI Platform Engineer Intern (job posting) · 16 September 2025 · secondary source
- BSI Assurance UK Limited: Certificate IS 757946 – ISO/IEC 27001:2022, Chengdu Monolithic Power Systems Co., Ltd. · 30 October 2024 · primary source
- BSI: Certificate IS 757946 – ISO/IEC 27001:2013 (earlier version) · 14 December 2021 · primary source
- ENX Association: TISAX Assessment Result, Scope S7CP2Y – Chengdu Monolithic Power Systems Co., Ltd. · 29 May 2025 · primary source
- U.S. SEC (EDGAR, XBRL R13): 10-K 2025 – Cybersecurity Risk Management and Strategy Disclosure (R13.htm) · 27 February 2026 · primary source
- Board Cybersecurity: MONOLITHIC POWER SYSTEMS INC 10-K Item 1C. Cybersecurity – 2026-02-27 · 27 February 2026 · secondary source
- Board Cybersecurity: Monolithic Power Systems – Company Tracker · 19 May 2026 · secondary source
- Monolithic Power Systems: Monolithic Power Systems Statement Regarding Russia Sanctions · 1 February 2022 · secondary source
- U.S. SEC (EDGAR): Monolithic Power Systems, Inc. – Form 10-K for fiscal year 2025 · 27 February 2026 · primary source
- Business & Human Rights Resource Centre: Foreign technology fueling Russia's war in Ukraine · 3 November 2026 · secondary source
- Monolithic Power Systems: Privacy Policy · 3 November 2026 · secondary source
- Monolithic Power Systems: Supplier Code of Conduct · 26 October 2022 · secondary source
3 · Transparency
MPS describes AI as a growth driver but does not disclose where and how it uses AI itself.
What is documented
The case against
No disclosure of its own AI
- Neither the sustainability report nor the GRI index nor the privacy policy describes AI applications, their limitations or the models used6 10 5
- That internal AI agents are based on fine-tuned open models is evident only from job postings8 9
- The AI building management mentioned in the report is not described6 7
Sources for Transparency (10)
- U.S. SEC (EDGAR): Monolithic Power Systems – Form ARS (annual report) 2025 · 29 April 2026 · secondary source
- Monolithic Power Systems (Investor Relations): MPS 2025 Form 10-K (PDF) · 27 February 2026 · secondary source
- U.S. SEC (EDGAR): Monolithic Power Systems, Inc. – Form 10-K for fiscal year 2025 · 27 February 2026 · primary source
- U.S. SEC (EDGAR): Monolithic Power Systems, Inc. – Form 10-Q for the quarter ended 2026-06-30 · 5 August 2026 · primary source
- Monolithic Power Systems: Privacy Policy · 3 November 2026 · secondary source
- Monolithic Power Systems: Corporate Responsibility Report 2026 (reporting year 2025) · 1 April 2026 · primary source
- Monolithic Power Systems: MPS ESG Report 2025 (reporting year 2024) · 1 April 2025 · secondary source
- Simplify (Stelleninserat Monolithic Power Systems): AI Developer Intern (Summer 2026) (job posting) · 16 May 2026 · secondary source
- glich.co Jobboard (Stelleninserat Monolithic Power Systems): AI Platform Engineer Intern (job posting) · 16 September 2025 · secondary source
- Monolithic Power Systems: 2026 MPS GRI Report (Index) · 1 May 2026 · secondary source
4 · Why the harm rule does not apply
The harm rule does not apply: there is no controversy with an AI, data or cyber link, and no judgment, authority decision or fine concerning harm caused by its own AI.
5 · Controversies (0)
No AI controversy found.
6 · What remains open
- Content and implementation of the internal AI policies and governance of the AI agents in HR, finance and customer service
- Responsibility for AI risks at board and management level
- Scope of the information security certificates beyond Chengdu
- Items 1C and 3 of the 2025 10-K in the original, which were truncated on retrieval
7 · How it was assessed
Cut-off date: 3 November 2026 · 42 searches, 35 fetches.
Primary documents read (7)
- Form 10-K 2025 (S08, two retrievals; Item 1 and parts of 1A) and XBRL R13 Cybersecurity (S09); Filing Index and FilingSummary for localisation
- Form 10-K 2025 as Investor Relations PDF (S11, two retrievals) and Form ARS 2025 (S10, three retrievals, risk factors)
- Form 10-Q Q2 2026 (S07, two retrievals) and as PDF with Legal Proceedings (S06, two retrievals); Form 10-Q Q1 2026 (Note 7, excluding Item 1)
- Proxy Statement DEF 14A 2026 (S12, two retrievals); 8-K voting results 2025 and 2026 (S29, S30)
- Corporate Responsibility Report 2026 (S13), ESG Report 2025 (S15), GRI Index 2026 (S14)
- Zertifikate: ISO/IEC 27001:2022 und 2013 (S16, S17), TISAX (S18), ISO 9001 (S19), Qualitätsseite (S20)
- Policies: Privacy Policy (S21), Code of Ethics (S22), Supplier Code of Conduct (S23), Russia Statement (S24)
Research of 3 November 2026 under Globalance AI Footprint rulebook version 0